Resurfaced community pool and clubhouse at Wimbledon Place Townhomes in Cobb County
HOA Project · Wimbledon Place, Cobb County

47 Townhomes. One Full Exterior.

Wimbledon Place Townhomes hired Sentinel Exteriors to renew the outside of all 47 units in one coordinated project. That meant replacing failing cedar siding with fiber cement, new paint, decks and roofs, repairing hidden water damage, and a new PebbleTec finish on the community pool. Residents lived at home the whole time.

  • 47 units, about 173 residents on site
  • About 6 months from start to finish
  • Siding, paint, decks, roofing and pool
  • Wimbledon Place Townhomes, Cobb County
At a glance

The project

CommunityWimbledon Place Townhomes, Cobb County (East Cobb / Marietta area)
Size47 townhome units, about 173 residents living on site
TimelineAbout 6 months
SidingAllura fiber cement, replacing the original cedar siding
PaintSherwin-Williams Duration exterior acrylic
RoofingComplete GAF roofing system
DecksNew pressure-treated decking and railings
PoolPebbleTec pool finish, applied by PebbleTec authorized installers
The problem

Cedar siding at the end of its life

The community's original cedar siding was failing and had to be replaced. Rather than patch it building by building, Wimbledon Place chose a full upgrade to fiber cement, with new decks and roofs in the same project.

Wimbledon Place townhome building with original cedar siding and decks before renovation
Before
Original second-story decks and stairs at Wimbledon Place before replacement
Before
Rotted cedar siding and trim below a window before replacement
Before
What we found

Hidden damage behind the siding

Once the old siding came off, we found areas of water damage from earlier problems that weren't visible from outside. We repaired those areas and ran commercial dehumidifiers to dry them out before closing the walls back up, so the new siding went on over sound, dry framing.

Water-damaged framing found behind old siding at Wimbledon Place
Found during tear-off
Rotted rim and sill framing exposed after siding removal
Found during tear-off
Rot at an exterior corner uncovered during siding removal
Found during tear-off
What we did

One project, every surface

  • Siding upgrade: removed the failing cedar siding and installed Allura fiber cement siding over new house wrap.
  • Paint: finished the exterior with Sherwin-Williams Duration.
  • Moisture remediation: repaired hidden water damage and dried those areas with commercial dehumidifiers before closing up.
  • Decks: replaced the decking and railings with new pressure-treated lumber.
  • Roofing: installed a complete GAF roofing system.
  • Pool: coordinated a new PebbleTec pebble finish for the community pool, applied by PebbleTec authorized installers.
Townhome building wrapped in new house wrap during the siding replacement
DuringNew house wrap
New pressure-treated deck boards going down on a townhome deck
DuringNew decking
New pressure-treated deck railing on a Wimbledon Place townhome
NewDeck railing
Row of new deck railings across a townhome building
NewDeck railings
New fiber cement lap siding on a Wimbledon Place building
NewFiber cement siding
Community pool with new PebbleTec finish and waterline tile
AfterPebbleTec pool
On site

Working around 173 residents

Six months, 47 homes, and residents living at home through every phase. Here's our crew on site at Wimbledon Place.

★★★★★

“Working with Sentinel was a great experience, largely because of their communication and professionalism from start to finish… There were quite a few unexpected issues along the way, but they never dodged a conversation or left us guessing about next steps… They explained options in plain terms, kept us updated regularly, and followed through on what they said they would do… If you’re looking for a contractor who communicates well and takes ownership of challenges, I’d absolutely recommend them.”

Dylan G. · Google review · Wimbledon Place resident
HOAs and property managers

Planning a community project?

We walk the property, put the plan in writing, and keep every unit to the same standard, with one point of contact for the board.